PRICING FROM SHAKEDOWN REPORT-STEP 2 NEW PARTS

PRICING FROM SHAKEDOWN REPORT-STEP 2 NEW PARTS



For engines and boxes we also apply KM based pricing (see separate article titled "SHAKEDOWN PRICING FOR ENGINES AND TRANSMISSIONS (KM BASED)")
We need to ensure fresh high demand stock achieves the best return ,we use the returns from these items to ensure we can keep buying stock and to allow for discounting we do on other items 
----------------------------------------------------------------------------------------------------------------------------------------
UNDERSTOCKED ITEMS
We need to increase the price of understocked "no discount" & "good price" items 
We should be the highest competitively priced item on these ones 
Example below: We are highest "competitively priced" @$450 on this understocked item (price range $250-$440), although other supplier is showing $550 this is way too high and not competitive


------------------------------------------------------------------------------------------------------------------

PROCESS 

WE EXPORT SHAKEDOWN LIST FROM PINNACLE TO EXCEL AS PER STEP 1 
WE REMOVE COLUMNS AS PER STEP 1 
 
WE REMOVE ITEMS WHERE DAYS IN STOCK IS MORE THAN 30 DAYS 
WE REMOVE ITEMS THAT HAVE BEEN REPRICED IN LAST 90 DAYS (You will know this from the c,so remove each line ) 
We sort by price 
All items above always check amount ( this is a dollar figure found in google docs document ) we will check the price 
so copy these items into google spreadsheet 
then go back to excel list and look at remaining items 
sort by REC STATUS 
we are only looking at items with rec status of 
WAREHOUSE 
YARD BOLTED 
these are the high demand items 

so copy these items into excel spreadsheet  
add the extra 5 columns as per step 1
then start doing the pricing 

REMEMBER WE ARE WANTING TO GET THE MAXIMUM RETURN WITH THESE ITEMS (NO USE BEING CRAZY ) but we want the max return to pay for the discounts from step 1 
-------------------------------------------------------------------------------------------

1.    Once working on a specific new part, assign to your own colour and type “IN PROGRESS dd/mm”

2.       Once completed that specific new/old part, assign to Plat’s category with the date “TO CHECK dd/mm”

3.       Once I have checked the prices, I will assign back into your category and put “CHECKED dd/mm”

4.       Now you can add the required prices, and then follow the process to save to excel, send email to pricing@, fill in the completed date on the 'DONE FOR NEW PARTS'  on the first sheet, and move the previous date into the 'PREV DATE NEW PARTS', and delete the tab off the pricing sheet.


 

    • Related Articles

    • PRICING ZERO PRICED INVENTORY - STEP 2

      THIS TASK MUST BE DONE WITH DUAL SCREENS               ==========================================================================================================================       What to do if there are no invoice/quote history and no price from ...
    • PRICING FROM UNDERSTOCKED REPORT

      We use the understocked report to increase prices of items that we are consistently running out of it is increasingly a requirement in the age of e commerce that all items have a correct price this increases return on these cars for the business and ...
    • SHAW REPORT- Final Data entry- Updated July 2017

      In stage one of the Shaw report we will enter in the data that is available so we can get approximate end of month figures In stage 2 all data should be entered so we review this and enter in final figures for that month LINK TO SHAW REPORT The ...
    • SHAW REPORT - 1ST VERSION (Do at start of Month )

      SHAW REPORT SHAW REPORT SPREADSHEET VIEW THE VIDEO The Shaw report is a report/process that we use to obtain cost of goods figure for accounting ,its very important that it is kept accurate Before we start this task for the month ,ensure that all ...